Yabancı Donanma Projesi Elektrik Sistemi_rev900_türkmenistan

PROJECT DETAILS

[thememove_project_details_gk]

Additional Information

Ship Electrical System Design (in accordance with BV rules)

Manufacturing of All Main Switchboards, Power Distribution Panels, Bridge Console & Engine Control Consoles and Starters, Shore Connection Box, Supply of All Electrical System/Devices/Equipment

 Ship Electrical Outfitting

Project Completion Date

1-6th Fast Boat (2014-2016)
1 Tugboat (2014-2015)
1 Hydrographic Research Ship (2015-2016)